Work that has been completed:
    Thank you for those who helped accomplish the work in our church!

*Re-Stripe parking space to angel for safety. 2023
*Seal cracks in parking lot. 2023
*Replace exterior door at youth house. 2023
*Replace light fixtures in Nursery (Thx Keith). 2023
*Replace garbage disposal in CCC kitchen. 2023
*Replace thermostats. 2023
*Change our lettering on church sign. 2023
*Columbarium granite trim installed to finish look. 2023
*Replace CLC air conditioner condenser. 2023
*Replace/repair toilets in pre-school. 2023
*Replace two bathroom sinks in nursery. 2023
*Replace 31 ceiling tiles in office area damaged from rain. 2023
*Replace window screens in sanctuary. 2023
*Finished install of 16 security cameras around campus. 2023
*Install new bark inside playground area in pre-school. 2023
*Roof re-sealed around scuppers and drains in CCC fixing leaks.  2023
*Roof tar-sealed all seams in CLC fixing leaks. 2023
*Replace quilter's closets damaged by roof leak. 2023
*Sanctuary doors hardware replaced. 2023
*Sanctuary bathrooms door hardware's replaced for ADA compliant. 2023
*Install new seasonal sanctuary banners. 2023
*Repair and replace closet lights. 2023
*Repair broken plugs/light switches in CCC. 2023
*Replace broken canned lights in office area. 2023
*Installed new banners outside of sanctuary replaced damaged ones. 2023
*Installed new electrical Welcome Center for security team. 2023
*Install new toilet seats (4) in bathrooms and tighten the rest. 2023
*Install new hot water heater in CCC and office area. 2022
*Changed out lighting on outside of building with new LED bulbs. 2022
*Installed security cameras around the campus - Pre-School, Church and offices.  2022
*Build a new Welcome Center in the Sanctuary. 2022
*Build popcorn machine on wheels . 2022
*Fix drain in electrical room overflow. 2022
*Re-build of CCC kitchen; stoves, cabinets, dish wash machines and much more.  2022
*Install security screen in library. 2022
*Changed out almost all of light bulbs around campus with LED. 2022
*Repair vandalized pre-school shed. 2022
*Repair many older door and "closures" around campus. 2022
*Rid of old sound equipment with Paul's blessing. 2022
*Repair roof leaks all around campus and change out ceiling tiles. 2022
*Replace men's bathroom exhaust fan. 2022
*Install new outdoor lights in more traffic areas. 2022
*Continue to replace and repair toilet paper holders. 2022
*Attach a new screen in Sunday school theatre room. 2022
*Install hot water supply in all sinks on campus as per code. 2022
*Sheetrock repair and paint video room in sanctuary. 2022
*Build quilters room cabinet doors. 2022
*Replaced all bad exit signs and change out batteries to units on campus. 2022